24
Aug
2015
High Step Striping
ASAP Sands Outdoor Services was called out to stripe and stencil “High Step” on to a curb that was larger than normal, standing about a foot high. The yellow paint was laid down first, and allowed to dry before the “High Step” stencil was painted on. The business called us out to fix a striping job they had received in the winter, which did not cure because of the cold, and began to crack after a few months. The cracking paint was scraped and re-striped allowing the paint to cure and dry to the concrete allowing it last longer.
[top]